TM 9-2350-256-20-2
0212 00
Removal
1.
Remove two clamps (5) by removing screw (6) and lockwasher (7) from each.
2.
Remove two ground leads (1 and 2) from hull (8) by removing screw (9) and two lockwashers (10).
3.
Disconnect connector (3) from engine disconnect (11).
4.
Disconnect connector (4) from bulkhead to main engine bracket and rear fuel tank transmitter wiring harness (12).
Disassembly
1.
Disassemble lead assembly (see WP 0255 00 thru 0264 00, as appropriate).
Assembly
1.
Assemble lead assembly (see WP 0255 00 thru 0264 00, as appropriate).
Installation
1.
Connect connector (4) to bulkhead to main engine bracket and rear fuel tank transmitter wiring harness (12).
2.
Connect connector (3) to engine disconnect (11).
3.
Install two ground leads (1 and 2) to hull (8) with two lockwashers (10) and screw (9).
4.
Install two clamps (5) with lockwasher (7) and screw (6) to each.
NOTE
Follow-on maintenance: Install engine deck (see WP 0336 00).
END OF WORK PACKAGE
0212 00-2