TM 9-2350-256-20-2
0225 00
4.
Connect two connectors (10 and 11) to bulkhead to main engine wiring harness and starter relay wiring harness (28).
5.
Connect connector (9) to rigger's left service light (27).
6.
Connect connector (8) to rigger's right service light (26).
7.
Connect connector (7) to main engine generator relay (25).
8.
Connect connector (6) to rigger's switching relay box (24).
0225 00-7