TM 9-2350-256-20-2
0234 00
Removal
1.
Disconnect lead (1) from circuit breaker (3) by removing screw (4) and lockwasher (5).
2.
Disconnect connector (2) from switch panel, radio, and bilge pump to bulkhead wiring harness (6).
Disassembly
1.
Disassemble lead assembly (see WP 0255 00 thru 0264 00, as appropriate).
Assembly
1.
Assemble lead assembly (see WP 0255 00 thru 0264 00, as appropriate).
Installation
1.
Connect connector (2) to switch panel, radio, and bilge pump to bulkhead wiring harness (6).
2.
Connect lead (1) to circuit breaker (3) using lockwasher (5) and screw (4).
NOTE
Follow-on maintenance: Close stowage basket forward intermediate left floor plate (see WP 0306 00).
END OF WORK PACKAGE
0234 00-2