TM 9-2350-256-20-2
0273 00
7.
Install 19 self-locking bolts (9). Torque self-locking bolts to 337385 lb-ft (457522 Nm).
8.
Remove two jackscrews (10).
9.
Remove wooden block (8).
10. Connect brake rod (6) using straight pin (5) and cotter pin (4).
11. Install lubrication fitting (7), if necessary.
NOTE
Output reduction drive alignment ring (3) is installed in right-side output reduction drive (2) only.
12. Install output reduction drive alignment ring (3) in output reduction drive (2).
13. Install drive coupling (1) on output reduction drive (2).
NOTE
Follow-on maintenance: Install final drive hub and sprockets (see WP 0283 00); Install powerplant (see
WP 0098 00).
END OF WORK PACKAGE
0273 00-4