TM 9-2350-256-20-2
0271 00
6.
Remove sampling valve (20) and coupling (21).
Installation
1.
Install coupling (21) and sampling valve (20).
2.
Install bushing (19), crosspipe (18), and two tees (3).
3.
Connect temperature transmitter (16) and pressure transmitter (17) to crosspipe (18).
4.
Install two right-side oil cooler lines (8) by connecting two coupling nuts (12) to two tees (3). Install two gaskets (15) on
transmission oil cooler; connect two reducers (14) and two coupling nuts (13) on opposite ends of two oil cooler lines.
5.
Secure two right-side oil cooler lines (8) each with clamp (7), screw (9), two washers (10), and nut (11).
6.
Install two left-side oil cooler lines (1) to transmission by connecting two coupling nuts (2) to two tees (3). Install two
gaskets (6) on transmission oil cooler; connect two reducers (5) and two coupling nuts (4) on opposite ends of two oil cooler
lines.
NOTE
Follow-on maintenance: Install engine deck (see WP 0336 00).
END OF WORK PACKAGE
0271 00-3/4 blank