TM 9-2350-256-20-2
0273 00
10. Remove wooden block (8).
WARNING
Output reduction drive (2) must clear hull when assembly is lifted by lifting sling (11). If assembly does
not clear hull during lift, weight of vehicle will be transferred to lifting sling causing lifting sling failure.
All personnel are to stand clear of vehicle hull when lifting operation starts.
11. Remove output reduction drive (2) using lifting sling (11).
Installation
1.
Install lifting sling (11) on output reduction drive (2).
NOTE
Do not thread jackscrews (10) all the way through output reduction drive (2) at this time.
2.
Install two jackscrews (10).
WARNING
Output reduction drive (2) must clear hull when assembly is lifted by lifting sling (11). If assembly does
not clear hull during lift, weight of vehicle will be transferred to lifting sling causing lifting sling failure.
All personnel are to stand clear of vehicle hull when lifting operation starts.
3.
Install output reduction drive (2) using lifting sling (11).
4.
Place wooden block (8) under output reduction drive (2).
5.
Thread two jackscrews (10) into hull and remove lifting sling (11).
6.
Tighten two jackscrews (10) alternately to draw output reduction drive (2) against mating surface.
0273 00-3