TM 9-2350-256-20-2
0361 00
2.
Install lever (93), lockwasher (92), and screw (91).
3.
Install bell crank assembly (86) with flat washer (90), lockwasher (89), bolt (88), and lubrication fitting (87).
4.
Install two bell crank assemblies (79) to mounting brackets (80 and 81) with two grooved pins (85), four lubrication fittings
(83 and 84), and two retaining rings (82).
5.
Install nut (78) and bearing (77) to each end of tube assemblies (72, 73, and 74).
6.
Install tube assemblies (72, 73, and 74) with lockwasher (76) and screw (75) at each end.
NOTE
Linkages must be completely installed and aligned and rubber boot must be adjusted (see WP 0362 00)
before cementing rubber boot in place.
7.
Install bushing (71), clamp (70), and rubber boot (68) to tube assembly (67). Install tube assembly to bulkhead (69).
8.
Install nut (65) and rod end bearing (66) to each end of tube assembly (67).
9.
Install lockwasher (64) and screw (63).
10. Install nut (60) and bearing (59) to each end of tube assembly (56). Install tube assembly with lockwasher (58) and screw
(57).
11. Install six rollers (62) with six bolts (61).
12. Install nut (55) and bearing (54) to each end of tube assembly (51). Install tube assembly with lockwasher (53) and screw
(52).
0361 00-12