TM 9-2350-256-20-2
0411 00
3.
Unscrew and remove control knob (8) from control lever (5).
4.
Remove control rod (1) from control lever (5) by removing two cotter pins (9) and straight pin (10).
5.
Remove two end bearings (11) and two jamnuts (12) from control rod (1).
Installation
1.
Install two jamnuts (12) and two rod end bearings (11) on control rod (1).
2.
Install control rod (1) on control lever (5) with straight pin (10) and two cotter pins (9).
3.
Install control knob (8) on control lever (5).
4.
Install control lever (5) with screw (6) and self-locking nut (7).
5.
Connect control rod (1) to hoist winch (2) with straight pin (4) and two cotter pins (3).
NOTE
Follow-on maintenance: Install stowage basket forward intermediate left floor plate (see WP 0306 00).
END OF WORK PACKAGE
0411 00-2