TM 9-2350-256-20-2
0438 00
4.
Disconnect two connectors (20) from oil pressure indicator (21).
5.
Disconnect four connectors (22) from APU generator switch (23).
6.
Disconnect six connectors (24) from three switches (25).
7.
Disconnect six connectors (26) from three circuit breakers (27) and remove three lead assemblies (28) and APU control
box wiring harness (29).
8.
Remove three circuit breakers (27) by removing two screws (30), two lockwashers (31), and two nuts (32) from each.
0438 00-3