TM 9-2350-256-20-2
0438 00
Assembly
1.
Assemble three lead assemblies (28) and APU control box wiring harness (29) (see WP 0255 thru 0264 00, as necessary).
2.
Install control box ID plate (43) with four drivescrews (44), if removed.
3.
Install two indicator lights (19) using two lockwashers (42), two screws (41), gasket (40), and lens (39) for each.
4.
Install oil pressure indicator (21) using bracket (38), two lockwashers (37), and two nuts (36).
5.
Install APU generator switch (23) and three switches (25) using two switch guards (35), eight lockwashers (34), and eight
screws (33).
6.
Install three circuit breakers (27) using two nuts (32), two lockwashers (31), and two screws (30) for each.
7.
Connect six connectors (26) to three circuit breakers (27).
0438 00-5