TM 9-2350-256-20-2
UNIT MAINTENANCE
RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1
M239 LAUNCHER STOWAGE BOXES REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts
NOTE
Left and right stowage boxes are removed and installed in the same manner.
Removal
1.
Remove smoke grenade stowage boxes (1) by removing four screws (2) and four lockwashers (3).
Installation
1.
Install smoke grenade stowage boxes (1) with four screws (2) and four lockwashers (3).
END OF WORK PACKAGE
0444 00-1/2 blank