SECTION IV. HOISTING BOOM ASSEMBLYTM 9-2350-256-20b. INSTALLATION1Install two boot assemblies (35), two pipes (34),four loop clamps (33), and two hoses (30).2Install hose (31) with loop clamp (32).3Install hose (31) and two hoses (30) with clip (29),new lockwasher (28), and screw (27) each.4Install 12 fittings (26) as necessary.5Install tray (25) with 11 flat washers (24), 11 newlockwashers (23), and 11 screws (22).6Install wire rope assembly (21) with two pins (20)and two nuts (19).7Install shoe tree (18) with washer (17), pin (16), twonew lockwashers (15), and two screws (14).8Install two chains (11) with two pin shackles (13)and two retaining pins (12) each.9Install two pulleys (5) into guard (4), and insertshaft (10) through guard and pulleys.10 Install wire rope (9) onto shaft (10) with twonewlockwashers (8), two nuts (7), and two new cotterpins (6).11 Install guide bar (2), spring (3), and two screws (1)to guard (4).c. INSPECTIONInspect pin and last link of chain for defects and wear.11-19
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business