TM 9-2350-256-20 CHAPTER 11: MAINTENANCE OF MAIN WINCH. HOISTWINCH, AND RELATED COMPONENTSSECTION IV: HOISTING BOOM ASSEMBLYPara. Task Page11-11 Replace/Service Hoisting Boom, Cylinders, and Related Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . .11-1611-12 Services Stayline Cylinder Limit Valve Adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11-2011-11 REPLACE/SERVICE HOISTING BOOM, CYLINDERS, AND RELATED PARTSTHIS TASK COVERSa. Removal b. Installation c. InspectionINITIAL SET-UPTools: Parts-Continued:Tool kit, general mechanic’s (Appendix c, item 53)Pins, cotter (2) (Appendix G, item 226)Parts:Reference:•Lockwashers (3) (Appendix G, item 130)TM 9-2350-256-24P-2•Lockwashers (15) (Appendix G, item 132)Elevating the hoisting boom when both the main engine and the Auxiliary Power Unit are inoperableis a safety hazard and may cause injury to personnel.a. REMOVALNOTEThe hoisting boom will only be repaired (parts removed and installed) to the extent of thereplacement of parts authorized in TM 9-2350-256-24P-2.1Remove two screws (1), guide bar (2), and spring(3) from guard (4).2 Remove two pulleys (5) and guard (4) by removingtwo cotter pins (6), two nuts (7), two lockwashers(8), wire rope (9), and shaft (10).3 Remove two chains (11) by removing two retainingpins (12) and two pm shackles (13) from each.4 Remove two screws (1-1), two lockwashers (15)with pm (16), and washer (17) from shoe tree (18).11-16
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business