TM 9-2350-256-20b. INSTALLATION1 Install new gasket (4) and hose connecting panel (3) with 10 new lockwashers (2) and 10 screws (1).2 Apply sealant tape to threads and connect hydraulic lines to each side of the bulkhead using port referencetag.NOTEFollow-on maintenance:Install hydraulic connections access cover (see paragraph 9-7)Install rear right-side floor plate (see paragraph 9-6)Install air cleaner (right side) (see paragraph 4-24)12-27
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business