SECTION III: AIR INTAKE SYSTEMTM 9-2350-256-20Left Side5Install tube assembly (22) with two newlockwashers (21) and two screws (20).6Install air hose (18) and two clamps (17).7Install air duct (19), air hose (16), and clamps (15).8Install air intake hose (14) and tighten clamps (13).Both Sides9Install air intake hose (5) and two clamps (4).10 Install new preformed packing (12) and connect aircleaner restriction indicator hose (11).11 Install right and left side of elbow assembly (10)with two nuts (9), two flat washers (8), two newlockwashers (7), and two screws (6).12 Install three retaining rods (1), three new cotterpins (2), and three straight pins (3).NOTEFollow-on maintenance: • Close air inlet doors(see paragraph 9-56)• Install left and center-front air inlet grilles(see paragraph 9-57)• Install APU access cover(see paragraph 949)• Install engine deck(see paragraph 9-51)• Install air cleaner (seeparagraph 4-24)4-57
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business