SECTION V: VEHICLE WIRING
TM 9-2350-256-20
20 Install four connectors (3,4, 5, and 6) to generator (35) using two flat washers (37) and two nuts (36).
21 Connect connector (2) to transmission oil pressure sending unit (34).
22 Connect connector (1) to engine disconnect (30) using four screws (31), four new lockwashers (32), and four
nuts (33).
23 Install seven clamps (28) using screw (29) for each.
NOTE
Follow-on maintenance: Install powerplant (see paragraph 3-1)
6-147