SECTION II: HULL AND CAB COMPONENTS
TM 9-2350-256-20
9-49 REPLACE APU ACCESS COVER ASSEMBLY
THIS TASK COVERS
a.
Removal
b. Installation
INITIAL SET-UP
Tools:
Parts-Continued:
Tool kit, general mechanic's (Appendix C,
Lockwashers (12) (Appendix G, item 134)
item 53)
Lifting sling (Appendix C, item 9)
Personnel Required:
Three
Parts:
Gasket (Appendix G, item 73)
Equipment ConditionS:
Lockwashers (2) (Appendix G, item 116)
Right-front air inlet door opened (see paragraph
Lockwashers (4) (Appendix G, item 130)
9-56)
Lockwashers (11) (Appendix G, item 132)
Boom raised (refer to TM 9-2350-256-10)
a.
REMOVAL
1
Remove APU cooling air shield (1) by removing three screws (2) and three lockwashers (3).
2
Remove personnel heater exhaust (4) and gasket (5) by removing two screws (6) and two lockwashers (7).
9-79