Home
Download PDF
Order CD-ROM
Order in Print
Figure 2-21. Hoisting boom removal and installation (Sheet 2 of 2)
Figure 2-22. Main winch and spade assembly removal and installation (Sheet 2 of 2).
TM-9-2350-256-34-1 Recovery Vehicle Full-Tracked: Medium M88A1 (NSN 2350-00-122-6826) Manual
Page Navigation
54
55
56
57
58
59
60
61
62
63
64
TM 9-2350-256-34-1
2-48
Figure
2-22.
Main winch and spade assembly - removal and installation (Sheet 1 of 2).
TA171783
CHANGE 5