TM 9--2350--292--20--1
0227 00--1
ALIGNMENT/ADJUSTMENT OF ACCELERATOR CONTROLS AND LINKAGE
0227 00
THIS WORK PACKAGE COVERS:
Alignment, Adjustment (full throttle), Adjustment (hand throttle)
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Materials/Parts
Welding electrodes (AR) (item 9, WP 0716 00)
Equipment Conditions
Engine deck grilles removed
(TM 9--2350--292--10)
Linkage disconnected from engine throttle
lever (alignment only) (WP 0226 00)
Vehicular tool box rack and oddment tray
assembly removed (WP 0480 00)
References
TM 9--2350--292--10
Alignment
1. Loosen locknut (1) on throttle stop screw (2) and locknut (3).
2. Insert 1/8--in. welding electrode (4) in bracket (5) and pedal (6).
3. Loosen locknut (7) and adjust linkage (8) until 1/8 inch welding electrode (9) can be inserted in bell crank (10).
4. Tighten locknuts (1, 3 and 7), remove welding electrodes (4 and 9) and connect linkage to engine throttle lever
(WP 0226 00).
Figure 34
1
3
4
5
6
8
2
FORWARD
9
7
10