TM 9--2350--292--20--10226 00--13ACCELERATOR CONTROLS AND LINKAGE REPAIR -- CONTINUED0226 00Installation--Continued26. Install nut (73) and rod end (72) on rod (74).27. Install nut (71) and clevis (58) on rod assembly (69).28. Install three brackets (78) on six studs (79) with six flat washers (77), six new lockwashers (76) and six nuts (75).29. Install rod assembly (69) on floor with six rollers (66) and six screws (65).30. Install screw (67) and new lockwasher (68) attaching rod assembly (69) to clevis (70).Figure 34757677787967687273706566696566747158
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business