TM 9--2350--292--20--20625 00--1AUXILIARY POWER UNIT ENGINE HEAT SHIELDS REPLACEMENT (HATZ)0625 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)APU test stand (fabricated) (item 17, WP 0717 00)Materials/PartsLockwashers (5) (item 127, WP 0718 00)Lockwashers (5) (item 466, WP 0718 00)Lockwasher (item 85, WP 0718 00)Lockwashers (2) (item 465, WP 0718 00)Lockwashers (2) (item 469, WP 0718 00)Lockwashers (6) (item 9, WP 0718 00)Equipment ConditionsAPU removed from vehicle (WP 0587 00)ReferenceTM 9--2815--250--24&PNOTETag all electrical connections and electrical leads prior toremoval to aid in installation.Where applicable, remove sealant to expose designatedelectrical terminals.APU engine duct must be removed (WP 0621 00) exceptfor replacement of cooling air duct.Perform Removal steps 1 through 4 and 20 and Installa-tion steps 16 through 19 for replacement of side heatshield (chaincase end).Perform Removal steps 5 and 20 and Installation step 15for replacement of top heat shield.Perform Removal steps 6 through 17 and 20 and Installa-tion steps 3 through 14 for replacement of side heatshield (fan end).Perform Removal steps 18 through 20 and Installationsteps 1 and 2 for replacement of cooling air duct.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business