TM 9--2350--292--20--2
0624 00--1
AUXILIARY POWER UNIT ENGINE SHROUDS REPLACEMENT
0624 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
APU test stand (fabricated) (item 17, WP 0717 00)
Materials/Parts
Lockwashers (20) (item 110, WP 0718 00)
Equipment Conditions
APU access door open (TM 9--2350--292--10)
Personnel Required
Two
References
TM 9--2350--292--10
NOTE
Perform Removal steps 1 and 6 and Installation step 5 for
replacement of top panel shroud.
Perform Removal steps 2 and 6 and Installation step 4 for
replacement of bottom panel shroud.
Perform Removal steps 3, 4 and 6 and Installation steps
2 and 3 for replacement of left side (towards the rear of
vehicle) panel shroud.
Perform Removal steps 5 and 6 and Installation step 1 for
replacement of right side (towards the front of vehicle)
panel shroud.
Removal
1. Remove five screws (1), five lockwashers (2), top panel (3) and retainer (4). Discard lockwashers.
Figure 341
1
2
3
4