TM 9--2350--292--20--20624 00--1AUXILIARY POWER UNIT ENGINE SHROUDS REPLACEMENT0624 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)APU test stand (fabricated) (item 17, WP 0717 00)Materials/PartsLockwashers (20) (item 110, WP 0718 00)Equipment ConditionsAPU access door open (TM 9--2350--292--10)Personnel RequiredTwoReferencesTM 9--2350--292--10NOTEPerform Removal steps 1 and 6 and Installation step 5 forreplacement of top panel shroud.Perform Removal steps 2 and 6 and Installation step 4 forreplacement of bottom panel shroud.Perform Removal steps 3, 4 and 6 and Installation steps2 and 3 for replacement of left side (towards the rear ofvehicle) panel shroud.Perform Removal steps 5 and 6 and Installation step 1 forreplacement of right side (towards the front of vehicle)panel shroud.Removal1. Remove five screws (1), five lockwashers (2), top panel (3) and retainer (4). Discard lockwashers.Figure 3411234
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business