TM 9--2350--292--20--2
0686 00--5
BOOM SHUT OFF VALVE TRANSDUCERS AND RELATED PARTS
REPLACEMENT -- CONTINUED
0686 00
Installation
NOTE
Apply a thin even coat of clean lubricant to all preformed
packings prior to installation.
1. Install new preformed packing (21) on adapter (14), new preformed packing (20) on hose (13) and three new pre-
formed packings (17, 18 and 19) on tee (16).
2. Install tee (16) in boom shutoff valve (8).
3. Install adapter (14) on tee (16).
4. Install hose (15) on tee (16).
5. Install transducer 4MT543 (12) on hose (13) then install hose (13) on adapter (14).
6. Install wiring harness 4W504 connector P2 (11) on transducer 4MT543 (12).
NOTE;
BOOM SHUT OFF VALVE
HOSES AND FITTINGS
REMOVED FOR CLARITY
11
12
13
8
15
14
16
17
18
19
20
21