TM 9--2350--292--20--2
0438 00--3
APU DOOR ASSEMBLY AND HOLD--OPEN LATCH REPAIR -- CONTINUED
0438 00
Disassembly
1. Remove cotter pin (16), nut (17), two spring washers (18), latch (19) and handle (20) from door (21). Discard cot-
ter pin and spring washers.
2. Inspect parts for damage and replace as required.
Assembly
Install handle (20) and latch (19) on door (21) with two new spring washers (18), nut (17) and new cotter pin (16).
Figure 217
20
21
19
18
17
16