TM 9--2350--292--20--2
0497 00--10
MAIN WINCH AND SPADE ASSEMBLY REPLACEMENT -- CONTINUED
0497 00
Installation--Continued
NOTE
Lower spade to ground for access to mounting screws.
15. Apply sealing compound to threads and under heads of eight screws (1), install eight screws (1) and eight flat
washers (2) in front hull cover (3).
WARNING
Ensure spade assembly is in lock position when raised to
prevent injury to personnel.
16. Torque 44 screws (1, 10 and 12) using indicated sequence to 240--260 lb--ft (325--353 N m). Raise and lower
spade assembly (TM 9--2350--292--10) to provide access to screws for torquing. Repeat sequence until all fas-
teners hold the required torque without further rotation.
17. Install level winder armor end plate (8), if removed (WP 0511 00).
Figure 270
1
2
3
1
59
13
17
3
7
11
15
3335
3739 41 43 44 42 40 38
31 29 27 25 23 21 22 24 26 28 30
16
12
8
4
2
6
10
14
18
34
36
32
19
1
1
10
10
10
12
FRONT COVER TORQUE SEQUENCE
8
20
3
240--260 LB--FT (325--358 NSM) WET
NOTE
FOLLOW--ON MAINTENANCE:
Raise spade (TM 9--2350--292--10)
Install auxiliary winch (WP 0513 00)
Install floor plates #9, #10 and #12 (WP 0454 00)
END OF TASK