HYDRAULIC CONTROL VALVES REPLACEMENT -- CONTINUED
0562 00
Installation
WARNING
1. Clean all metal surfaces with cleaning cloth and dry--cleaning solvent prior to installation.
2. Apply a thin coating of lubricant to all new preformed packings.
3. Install pilot control valve (28), two new preformed packings (30), adapter (29) and two new preformed packings
(31) on manifold assembly (5) with two screws (27).
4. Install pilot control valve (23), two new preformed packings (26), adapter (24) and two performed packings (25) on
manifold assembly (5) with two screws (22).
5. Install boom DCV safety valve (20) and four new preformed packings (21) on manifold assembly (5) with four
screws (19).
6. Install auxiliary winch DCV valve (16), four new preformed packings (18) and five new preformed packings (17) on
manifold assembly (5) with four screws (15).