TM 9-2350-238-10OPERATING CRANE–CONTINUEDLEVEL WIND OPERATION–CONTINUED891011121314Do not touch level wind slideassembly unless level windswitch is in OFF position. Unex-pected turning of cab and boommay injure personnel and dam-age equipment.Make sure LEVEL WIND switch (8) is inOFF position.Remove two yoke bracket quick releasepins (9) and lower level wind assemblyover tow winch wire rope.Remove yoke bracket-to-boom quickrelease pin (10), lift yoke bracket, andsecure bracket to boom with quickrelease pin (10).Remove slide quick release pin (11) andsleeve (12) from slide (13). Position slide(13) over tow winch wire rope. Positionsleeve (12) under wire rope and intoslide and secure sleeve in place withquick release pin (11).Remove slide bar quick release pin ( 14)securing slide bar to housing (15) andstore pin in access hole in housing.Level wind is now ready for operation.After tow winch cable is attached torecovery load, turn LEVEL WIND switch(8) to ON for perfect winding of cable ontow winch.After operation, turn LEVEL WIND switch(8) to OFF and stow level wind assemblyand snatch block using reverse of steps1 thru 11.2-82
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business