TM 9-2350-238-10
OPERATING CRANECONTINUED
LEVEL WIND OPERATIONCONTINUED
8
9
10
11
12
13
14
Do not touch level wind slide
assembly unless level wind
switch is in OFF position. Unex-
pected turning of cab and boom
may injure personnel and dam-
age equipment.
Make sure LEVEL WIND switch (8) is in
OFF position.
Remove two yoke bracket quick release
pins (9) and lower level wind assembly
over tow winch wire rope.
Remove yoke bracket-to-boom quick
release pin (10), lift yoke bracket, and
secure bracket to boom with quick
release pin (10).
Remove slide quick release pin (11) and
sleeve (12) from slide (13). Position slide
(13) over tow winch wire rope. Position
sleeve (12) under wire rope and into
slide and secure sleeve in place with
quick release pin (11).
Remove slide bar quick release pin ( 14)
securing slide bar to housing (15) and
store pin in access hole in housing.
Level wind is now ready for operation.
After tow winch cable is attached to
recovery load, turn LEVEL WIND switch
(8) to ON for perfect winding of cable on
tow winch.
After operation, turn LEVEL WIND switch
(8) to OFF and stow level wind assembly
and snatch block using reverse of steps
1 thru 11.
2-82