TM 9-2350-238-10
OPERATING CRANECONTINUED
REEVING BOOM WINCH WIRE
ROPECONTINUED
2
3
4
5
Operate boom winch control handle (1)
and pay out about 3 ft (0.92 m) of wire
rope. Refer to page 2-73. Release single
boom block (2) from front of vehicle.
Place block on transmission deck.
Support winch wire rope clevis (3) and
remove quick release pin (4) securing
clevis to boom and remove clevis (3) and
wire rope. Install quick release pin in
boom,
Remove two quick release pins (5) from
single boom block (2). Pull wire rope (6)
and clevis through block. Install quick
release pins (5) in single boom block (2),
Stow boom block in cab stowage
compartment.
After single line pull operation, reeve
wire rope through single boom block and
attach wire rope clevis to boom using
reverse of steps 1 thru 4 above.
TRAVERSING CAB
1 Start hydraulic system, Refer to page
2-67
Make sure all personnel stand clear of boom
and block before traversing cab.
2 Operate boom winch. Refer to page
2-73. Pay out about 1 ft (0.30 m) of
wire rope and release single boom block
(1) from front of vehicle.
3 Raise boom until block clears front deck.
2-78