4.
Reconnect wire 25/27 to 15 A circuit breaker. Disconnect wire 10 from 15 A circuit breaker. Place
red lead of multimeter in wire 10 and black lead to ground. Turn MASTER switch on and check for
voltage. Turn MASTER switch OFF. If voltage is present, replace circuit breaker (see WP 0159 00). If
voltage is not present, repair/replace wire 10 of main lighting and B.O. selector switch wiring harness
(see WP 0218 00).
5.
Reconnect switch panel to gage panel and miscellaneous switches wiring harness from switch panel.
Install main switch panel (5), flat washer (4), ground lead (3), three lockwashers (2) and three screws
(1). Disconnect wire 627 of switch panel to gage panel and miscellaneous switches wiring harness
from switch panel side of power control lever switch. Place red lead of multimeter in wire 627 and
black lead to ground. Turn MASTER switch on and check for voltage. Turn MASTER switch OFF. If
voltage is present, go to step 6. If voltage is not present, repair/replace wire 627 of switch panel to gage
panel and miscellaneous switches wiring harness (see WP 0204 00 for dual voltage; 0205 00 for single
voltage).