TM 9-2350-256-20-1
0055 00
CORRECTIVE ACTION Continued
18. Remove four screws (1) and four lockwashers (2), and release electrical accessories panel (3). Ground
panel. Reconnect electrical accessories panel wiring harness to electrical accessories panel. Disconnect
wire 1 (from socket D) from generator cutout switch. Place red lead of multimeter in wire 1 and black
lead to ground. Turn MASTER switch on and check for voltage. Turn MASTER switch OFF. If voltage
is present, go to step 19. If voltage is not present repair/replace wire 1 of bilge pump main power wiring
harness from socket D (see WP 0233 00).
0055 00-12