TM 9-2350-256-20-1
0058 00
CORRECTIVE ACTION Continued
7.
Reconnect wire 25/27 to 15 A circuit breaker. Disconnect wire 10 from 15 A circuit breaker. Place
red lead of multimeter in wire 10 and black lead to ground. Turn MASTER switch on and check for
voltage. Turn MASTER switch OFF. If voltage is present, replace 15 A circuit breaker (see WP 0159
00). If voltage is not present, repair/replace wire 10 of main lighting and B.O. selector switch wiring
harness (see WP 0218 00).
8.
Reconnect switch panel to gage panel and miscellaneous switches wiring harness to main switch
panel. Install main switch panel (11), flat washer (10), ground wire (9), three lockwashers (8), and
three screws (7) to mounting brackets. Disconnect wire 48 pin A from bulkhead to master relay wiring
harness. Place red multimeter lead in socket and black lead to ground. Turn MASTER switch on and
check for voltage. If voltage is present, repair/replace switch panel, radio, and bilge pump to bulkhead
wiring harness (see WP 0202 00). If voltage is not present, troubleshoot master relay circuit (see WP
END OF WORK PACKAGE
0058 00-7/8 blank