SECTION VII: INTERIOR STOWAGE
TM 9-2350-256-20
7
Remove two retaining bars (20) by removing four screws (21) and four lockwashers (22). Remove acetylene
tank (refer to TM 9-2350-256-10).
8
Remove two cylinder bracket assemblies (23) by removing four screws (24) and four lockwashers (25) from
each.
9
Remove four door seal strips (26 and 27).
b. INSTALLATION
1
Install four new door seal strips (26 and 27) (Appendix E, items 3 and 4) with adhesive cement.
2
Install two cylinder bracket assemblies (23) with four new lockwashers (25) and four screws (24) in each.
Install acetylene tank (refer to TM 9-2350-256-10).
3
Install two retaining bars (20) with four new lockwashers (22) and four screws (21).
4
Install two door handles (15) with two latches (19), two flat washers (18), two nuts (17), and two new cotter
pins (16).
5
Install bolt cutter retaining clamp (12) with new lockwasher (14) and screw (13).
6
Install two hose retainers (8) with four flat washers (11), four new lockwashers (10), and four screws (9).
7
Install hose rack (5) with three new lockwashers (7) and three screws (6).
8
Install thumbscrew (4).
9
Install gage straps (2 and 3) and hose retaining strap (1).
9-237