TM 9-2350-256-203-2 REPLACE/SERVICE GROUNDHOP-Continuedb. TEST1 Place throttle control lever (10) and fuel shutoffcontrol lever (11) in open position.2 Start engine and observe gages, warning lights,and powerplant for proper operation with the aidof assistant.3 Place throttle control lever (10) at fast idle for 5seconds. Release and allow powerplant to warmup to 140-240 degrees (“) Fahrenheit (F) (60-116’Celsius [C]). Observe gages and warning lights.4 Place fuel shutoff control lever (11) in closedpositron to stop engine.c. REMOVALCHAPTER 3: MAINTENANCE OF ENGINENOTERight and left filter assemblies are removed in the same manner1 Remove filter assembly (9.5), two clamps (9.4), and hose (9.3).1.1 Install cover (9.2) and clamp (9.1)3-14.2 Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business