Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
inoperable vehicle
PREPARATION FOR OPERATION (cont)
TM-9-2350-256-20 Carrier Cargo Tracked 6-Ton M548A1 (2350-01-096-9356) M548A3 2350-01-369-6081 Manual
Page Navigation
433
434
435
436
437
438
439
440
441
442
443
TM 9-2350-256-20
CHAPTER 3: MAINTENANCE OF ENGINE
3-2.1 EMERGENCY BOOM OPERATION-Continued
NOTE
Steps 4 thru 6 apply to the slaving vehicle.
4
Disconnect hose (7) from hydraulic connections panel port 85 (8).
5
Disconnect hose (9) from hydraulic pump (10).
6
Disconnect hose (11) from APU pressure switch (12).
3-14.6
Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business