Home
Download PDF
Order CD-ROM
Order in Print
PREPARATION FOR OPERATION
slaving vehicle
TM-9-2350-256-20 Carrier Cargo Tracked 6-Ton M548A1 (2350-01-096-9356) M548A3 2350-01-369-6081 Manual
Page Navigation
434
435
436
437
438
439
440
441
442
443
444
TM 9-2350-256-20
NOTE
Steps 7 thru 9 apply to the inoperable vehicle.
7
Connect hose (13) to port 85 (2) at hydraulic connections panel.
8
Connect hose (14) to quick disconnect (4).
9
Connect hose (15) to APU pressure switch (6).
Change 1
3-14.7