TM 9-2350-256-20CHAPTER 3: MAINTENANCE OF ENGINE3-2.1 EMERGENCY BOOM OPERATION-Continuedd. AFTER OPERATIONNOTESteps 1 thru 3 apply to the slaving vehicle.1Disconnect hose (15) from APU pressure switch (12).2Disconnect hose (14) from hydraulic pump (10).3Disconnect hose (13) from port 85 (8) at hydraulic connections panel.3-14.10 Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business