TM 9-2350-256-20
CHAPTER 3: MAINTENANCE OF ENGINE
3-2.1 EMERGENCY BOOM OPERATION-Continued
d. AFTER OPERATION
NOTE
Steps 1 thru 3 apply to the slaving vehicle.
1
Disconnect hose (15) from APU pressure switch (12).
2
Disconnect hose (14) from hydraulic pump (10).
3
Disconnect hose (13) from port 85 (8) at hydraulic connections panel.
3-14.10 Change 1