TM 9-2350-256-20
c. ASSEMBLY
NOTE
Mounts are to be assembled with a total of
0.030 + 0.015 in. (0.7620 + 0.3810 mm) of
precompression clearance.
S h i m i f
required.
1 Install two spacers (14) and two shims (13) to
saddle (15).
2 Install four mounts (12) with four screws (11) and
four new self-locking nuts (10).
d. INSTALLATION
1 Install saddle assembly (6) to engine mount (7)
with two screws (8) and two new self-locking nuts
(9).
2 lnstall engine mount assembly (1) to engine (2)
with six screws (5), six flat washers (4), and six new
self-locking nuts (3). Torque self-locking nuts to
250-280 lb-ft (339-380 Nom).
NOTE
Follow-on maintenance:
Install powerplant (see paragraph 9-51)
3-4
REPLACE ENGINE REAR MOUNT AND BASE ASSEMBLY
THIS TASK COVERS
a. Removal
b. Installation
INITIAL SET-UP
Tools:
Tool kit, general mechanics (Appendix C, item 53)
Parts:
Parts-Continued:
Lockwashers (4) (Appendix G, item 145)
Pins, cotter (8) (Appendix G, item 204)
Lockwashers (3) (Appendix G, item 130)
Equipment Condition:
Lockwashers (8) (Appendix G, item 132)
Powerplant removed (see paragraph 3-1)
3 - 1 7