TM 9-2350-256-20c. ASSEMBLYNOTEMounts are to be assembled with a total of0.030 + 0.015 in. (0.7620 + 0.3810 mm) ofprecompression clearance. S h i m i frequired.1 Install two spacers (14) and two shims (13) tosaddle (15).2 Install four mounts (12) with four screws (11) andfour new self-locking nuts (10).d. INSTALLATION1 Install saddle assembly (6) to engine mount (7)with two screws (8) and two new self-locking nuts(9).2 lnstall engine mount assembly (1) to engine (2)with six screws (5), six flat washers (4), and six newself-locking nuts (3). Torque self-locking nuts to250-280 lb-ft (339-380 Nom).NOTEFollow-on maintenance: Install powerplant (see paragraph 9-51)3-4 REPLACE ENGINE REAR MOUNT AND BASE ASSEMBLYTHIS TASK COVERSa. Removal b. InstallationINITIAL SET-UPTools:Tool kit, general mechanic’s (Appendix C, item 53)Parts:Parts-Continued:Lockwashers (4) (Appendix G, item 145)Pins, cotter (8) (Appendix G, item 204)Lockwashers (3) (Appendix G, item 130) Equipment Condition:Lockwashers (8) (Appendix G, item 132) Powerplant removed (see paragraph 3-1)3 - 1 7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business