Home
Download PDF
Order CD-ROM
Order in Print
AFTER OPERATION (cont) - TM-9-2350-256-20_456
AFTER OPERATION (cont) - TM-9-2350-256-20_458
TM-9-2350-256-20 Carrier Cargo Tracked 6-Ton M548A1 (2350-01-096-9356) M548A3 2350-01-369-6081 Manual
Page Navigation
439
440
441
442
443
444
445
446
447
448
449
TM 9-2350-256-20
CHAPTER 3: MAlNTENANCE OF ENGINE
3-2.1 EMERGENCY BOOM OPERATION-Continued
NOTE
Steps 7 thru 9 apply to the slaving vehicle.
7
Connect hose (11) to APU pressure switch (12).
8
Connect hose (9) to hydraulic pump (10).
9
Connect hose (7) to hydraulic connections panel port 85 (8).
3-14.12 Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business