Home
Download PDF
Order CD-ROM
Order in Print
PREPARATION FOR OPERATION (cont)
OPERATION - TM-9-2350-256-20_454
TM-9-2350-256-20 Carrier Cargo Tracked 6-Ton M548A1 (2350-01-096-9356) M548A3 2350-01-369-6081 Manual
Page Navigation
435
436
437
438
439
440
441
442
443
444
445
TM 9-2350-256-20
CHAPTER 3: MAINTENANCE OF ENGINE
3-2.1 EMERGENCY BOOM OPERATION-Continued
NOTE
Steps 10 thru 12 apply to the slaving vehicle.
10
Connect hose (13) to port 85 (8) at hydraulic connections panel.
11
Connect hose (14) to hydraulic pump (10).
12
Connect hose (15) to APU pressure switch (12).
3-14.8
Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business