CHAPTER 6: MAINTENANCE OF ELECTRICAL SYSTEMS AND CIRCUITS
TM 9-2350-256-20
6-63 REPLACE/REPAIR ENGINE DISCONNECT GROUND LEAD ASSEMBLY (12322589)--Continued
b. DISASSEMBLY
Disassemble lead assembly (see Chapter 6, Section VII).
c. ASSEMBLY
Assemble lead assembly (see Chapter 6, Section VII).
d. INSTALLATION
1
Connect connector (4) to bulkhead to main engine bracket and rear fuel tank transmitter wiring harness (12).
2
Connect connector (3) to engine disconnect (11).
3
Install two ground leads (1 and 2) to hull (8) with two new lockwashers (10) and screw (9).
4
Install two clamps (5) with new lockwasher (7) and screw (6) to each.
NOTE
Follow-on maintenance: Install engine deck (see paragraph 9-51)
6-64 REPLACE/REPAIR HEADLIGHT BASE WIRING HARNESS AND RELATED PARTS (7972352)
THIS TASK COVERS
a.
Removal
b.
Disassembly
c.
Assembly
d.
Installation
INITIAL SET-UP
Tools:
Parts:
Equipment Condition:
Tool kit, general mechanic's
Lockwashers (2) (Appendix G,
Headlight removed (see paragraph 6-26)
(Appendix C, item 53)
item 113)
Lockwashers (3) (Appendix G,
item 130)
6-164