TM 9-2350-256-34-11.2.3.4.STRIP CABLE INSULATION EQUAL TO DEPTH OF SOLDER WELLS OF INSERTS.PASS CABLE ENDS THROUGH GROMMET RETAINING NUT, GROMMET ANDCOUPLING NUT, INSERT INTO SOLDER WELLS OF INSERTS AND SOLDER. (TB SIG 222)SLIDE GROMMET OVER INSERTS AND PRESS INTO SHELL ASSEMBLY UNTILSEATED.THREAD GROMMET RETAINING NUT TO SHELL ASSEMBLY UNTIL SEATED.D.Plug assemblies1 .STRIP CABLE INSULATION EQUAL TO DEPTH OF SOLDER WELLS OF INSERTS.2.PASS CABLE ENDS THROUGH GROMMET RETAINING NUT AND GROMMET,INSERT INTO SOLDER WELLS OF INSERTS AND SOLDER. (TB SIG 222)3.SLIDE GROMMET OVER INSERTS AND PRESS INTO RECEPTACLE ASSEMBLYUNTIL SEATED.4. THREAD GROMMET RETAINING NUT INTO RECEPTACLE UNTIL SEATED.E.Receptacle assembliesNOTE 1.DO NOT DISTORT SKIRTS OF TERMINAL WHEN CRIMPING TO CABLE.TA016004NOTE 2.IN PLUG AND RECEPTACLE ASSEMBLIES PLUG ALL SPARE GROMMET HOLES WITH ROD (NSN 9390-00-180-7289).Figure 3-20. Wiring harness cable connectors–repair (Sheet 2 of 2).3-39
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business