TM 9-2350-256-34
0079 00
Inspection-Acceptance and Rejection Criteria
1.
Inspect all threaded parts for nicks, burrs, and cross-threading. Repair with a thread chaser.
2.
Inspect combination control valve for cracks or dented surfaces.
3.
Inspect fittings for nicks, burrs, cracks, or leakage. Remove burrs with a fine, hard sharpening stone.
Assembly
1.
Install six packings (18) and two packings (17) to combination control valve (16).
2.
Install combination control valve (16) and four screws (15) to subplate (5).
3.
Install tee (31), coupling pipe (30), and valve (29) to subplate (5).
4.
Install bushing (28), three nuts (26), and adapter unions (27) to subplate (5).
5.
Install two nuts (24) and elbows (25) to subplate (5).
6.
Install two gage ports (22) and plugs (21) to combination control valve (16).
7.
Install nut (19) and union (20) to subplate (5).
Installation
NOTE
If entire entire spade subplate and control valve assembly (14) was removed, perform steps 3 thru 7 only.
If only combination control valve (16) was removed, perform steps 1, 2, and 5 only.
1.
Install six packings (hidden) (18) and two packings (hidden) (17) to combination control valve (16).
2.
Install combination control valve (16) and four socket head screws (15).
3.
Install subplate and control valve assembly (14) with brackets attached, four lockwashers (13), and screws (12).
4.
Connect hydraulic lines (11).
0079 00-5