TM 9-2350-256-34
0079 00
5.
Connect spade control cable (10), install pin (9) and two cotter pins (8), and tighten two jamnuts (7).
6.
Connect two hydraulic lines (6).
7.
Connect hydraulic line (4) to subplate (5) and install two flanges (3), four lockwashers (2), and screws (1).
END OF WORK PACKAGE
0079 00-6