TM 9--2350--292--100047 00--5OPERATE BOOM -- CONTINUED0047 00RIGGING BOOM -- CONTINUED9. Bring cable under and around outside (rotating) boom pulley (16).10. Pull cable forward and lay it in upper pulley (17) of the 35--ton (31,780 kg) hook block (4) as illustrated.11. Bring cable back over upper cross--member (18) and down under middle boom pulley (19).161941718
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business