TM 9--2350--292--100047 00--6OPERATE BOOM -- CONTINUED0047 00RIGGING BOOM -- CONTINUED12. Bring cable forward, around middle boom pulley (19).13. Bring cable forward and lay it in lower pulley (20) of the 35--ton (31,780 kg) hook block (4) as illustrated.14. Bring cable back over upper cross--member (18), and under outside stationary pulley (21).204TOPSIDE211918
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business