TM 9--2350--292--10
0047 00--7
OPERATE BOOM -- CONTINUED
0047 00
RIGGING BOOM -- CONTINUED
15. Bring cable forward, around outside stationary pulley (21).
16. Remove nut (22) and screw (23) or cotter pin (22) and headless pin (23) from hoist winch cable end.
17. Bring cable forward and secure it to cable lug (24) with screw (23) and nut (22) or headless pin (23) and cotter pin
(22).
22
23
24
21
24
22
23