TM 9--2350--292--100047 00--8OPERATE BOOM -- CONTINUED0047 00RIGGING BOOM -- CONTINUED18. Install two rope guard plates (10), four flat washers (9), four lockwashers (8), and four screws (7).19. Install hook (6) and latchpin and nut assembly (5) in 35--ton (31,780 kg) hook block (4).WARNING20. Install fillister screw (3) and secure with new lockwire (2).21. Install two cable retainers (14), four flat washers (13), four lockwashers (12), and four screws (11).22. Secure 35--ton (31,780 kg) hook block (4) in boom tray (25) with straps (1) unless a hoist operation is to be done.15678910111112121314141332425