TM 9--2350--292--20--1
CURRENT SHUNT REPLACEMENT -- CONTINUED
0255 00
Installation
1. Install shunt (19) with four screws (16), four new lockwashers (18) and four flat washers (17).
2. Install three lead assemblies 3W209 (3, 4 and 5) with two screws (1) and two new lockwashers (2).
3. Install wiring harness 3W801 wires X and Y (9 and 10) with two screws (6), two new lockwashers (8) and two flat
washers (7).
4. Install three lead assemblies 3W210--1, --2 and --3 (13, 14 and 15) with two screws (11) and two new lockwashers
(12).
5. Apply insulating compound to shunt (19) connection points.
Figure 72
1
2
4
5
1
3
19
6
8
7
9
6
8
7
10
11
12
13
11
12
14
15
16
18
17
2
NOTE
FOLLOW--ON MAINTENANCE:
Connect battery power (WP 0256 00)
END OF TASK
0255 00--3/4 blank