Any dam-
aged, mis-
sing or non--
operating
gauge, or
warning
lights loose
or damaged
electrical
connections
or mounting
hardware.
2
3
4
1
5
6
PTO/ACCESSORY
PANEL
(mounted on back of
hoist winch cable
chute (not shown))
TM 9--2350--292--20--1
0187 00--81
0187 00
PREVENTIVE MAINTENANCE CHECKS AND SERVICES INCLUDING
LUBRICATION INSTRUCTIONS -- CONTINUED
TABLE 3 PREVENTIVE MAINTENANCE CHECKS AND SERVICES
INCLUDING LUBRICATION INSTRUCTIONS, SEMIANNUALLY -- CONTINUED
ITEM
NO.
NOT FULLY
MISSION
CAPABLE
IF:
PROCEDURE
LOCATION
ITEM TO
CHECK/
SERVICE
INTERVAL
SEMIANNUALLY
INTERIOR
4
Instrument
Gauges and
Warning Lights
a. Inspect gauge panel (1), MAIN switch
panel (2), APU panel (3), hydraulic control
panel (4), PTO/accessory panel (5) and
brake pressure gauge (6). Repair or
replace any broken instruments, gauges
and warning lights.
b. Inspect and tighten loose electrical
connections and mountings as required.