TM 9--2350--292--20--20620 00--1AUXILIARY POWER UNIT DUCTING REPLACEMENT0620 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Materials/PartsLockwashers (2) (item 10, WP 0718 00)Lockwashers (4) (item 9, WP 0718 00)Gasket (item 100, WP 0718 00)Material/Parts--ContinuedLockwashers (3) (item 11, WP 0718 00)Lockwashers (5) (item 12, WP 0718 00)Lockwashers (4) (item 2, WP 0718 00)Personnel RequiredTwoReferencesTM 9--2350--292--10NOTEPerform Removal steps 1 and 20 and Installation steps18 and 19 for replacement of engine air cleaner hose.Perform Removal steps 2 through 9 and 20 and Installa-tion steps 11 through 17 for replacement of engine airduct.Perform Removal steps 10 through 16 and 20 and Instal-lation steps 4 through 10 for replacement of engine aircleaner duct.Perform Removal steps 17 through 20 and Installationsteps 1 through 3 for replacement of generator air duct.Removal1. Loosen clamps (1 and 2) and slide both clamps (1 and 2) back over air cleaner hose (3). Remove hose (3) fromfittings at both ends. Remove both clamps (1 and 2) from hose (3).Figure 340231
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business