TM 9--2350--292--20--2
0620 00--1
AUXILIARY POWER UNIT DUCTING REPLACEMENT
0620 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Materials/Parts
Lockwashers (2) (item 10, WP 0718 00)
Lockwashers (4) (item 9, WP 0718 00)
Gasket (item 100, WP 0718 00)
Material/Parts--Continued
Lockwashers (3) (item 11, WP 0718 00)
Lockwashers (5) (item 12, WP 0718 00)
Lockwashers (4) (item 2, WP 0718 00)
Personnel Required
Two
References
TM 9--2350--292--10
NOTE
Perform Removal steps 1 and 20 and Installation steps
18 and 19 for replacement of engine air cleaner hose.
Perform Removal steps 2 through 9 and 20 and Installa-
tion steps 11 through 17 for replacement of engine air
duct.
Perform Removal steps 10 through 16 and 20 and Instal-
lation steps 4 through 10 for replacement of engine air
cleaner duct.
Perform Removal steps 17 through 20 and Installation
steps 1 through 3 for replacement of generator air duct.
Removal
1. Loosen clamps (1 and 2) and slide both clamps (1 and 2) back over air cleaner hose (3). Remove hose (3) from
fittings at both ends. Remove both clamps (1 and 2) from hose (3).
Figure 340
2
3
1